3 Installing Device
This chapter introduces how to install the device.
3.1 PLC equipment installation
When the ED-PLC2010 series device leaves the factory, the DIN-rail bracket is installed as standard by default.
Steps:
- Face the side of the DIN-rail bracket to the rail to be installed, and the upper side of the bracket is sleeved on the upper side of the rail.

- Press down the buckle on the lower side of the DIN-rail bracket until the bracket can be buckled on the rail, and the installation is completed.

3.2 I/O Modules Installation
The I/O modules support mounting on DIN rails.
Steps:
The following is an example of the installation of an 8-terminal module only.
- Align the notches in the I/O module.

- Secure the I/O module to the DIN rail by pushing the I/O module in the direction of the arrow onto the DIN pin.
